en
20/05/2022

Installation of a CKE 4 MULTI 557 booster set with a 200lts hydra-pneumatic tank.

In a building, there are two main elements that cannot fail for a builder: the electrical system and the hydraulic system.

The Officia Nordelta office building is the first AAA building in the fastest growing strategic urban development centre in Argentina in recent years. ESPA Argentina's subsidiary ESPA Argentina has successfully supplied and installed the entire complex water supply system of the building according to the technical requirements of the LEED standards.

 

Empresa constructora: Pedro Podestal SA | Arquitectura: Alricgalindez Arquitectos

Do you want to receive the latests news from ESPA?